Tananger supply base

Industries menu image

Safe decontamination and disposal of FPSO subsea infrastructure and produced water

Decommissioning offshore assets is complex and strictly regulated. For their UK decommissioning programme, the operator required the safe receipt, decontamination and disposal of subsea infrastructure and large volumes of produced water from an FPSO and associated fields.

The scope covered the decommissioning and processing of contaminated produced water, flushing fluids and more than 2,000 tonnes of subsea materials - including risers, umbilicals, concrete mattresses, hydrocarbons and debris - distributed across multiple UK ports. Our client required delivery of a compliant, cost-effective and fully coordinated solution across multiple locations, without compromising safety or schedule.

Decom Case Study Small 1

Client

Major upstream oil and gas operator

Scope

Decommissioning, Environmental Services, NORM Management

Location

UK

Duration

Multi-phase, nationwide programme

NORM

At a glance

Approach

Impact

Unlock greater operational control.

Strengthen your operation with the expertise and processes that move complex assets with greater speed, safety, and discipline.