Tananger supply base

Industries menu image

Case Studies

Success in action, delivering value and performance for our clients across logistics, materials and operations management.

  • Environmental
  • Project Logistics
Methanol Case Study

14,000 tonnes of methanol regenerated through managed off-site processing

View case study
  • Environmental
  • NORM
  • Decomissioning
Truck offload

98% recycling rate achieved in complex decommissioning project

View case study
  • Environmental
  • NORM
  • Decomissioning
Client item offloaded

98.87% recycled, 0% NORM: Flexible waste management for 18 multi-field wellheads

View case study
  • Environmental
  • NORM
NORM contaminated coil tubing

Dry ice blasting for NORM-contaminated coil tubing reel reduces time and waste

View case study
  • Project Logistics
  • Environmental
  • Marine Coordination
Aberdeen south harbour ship

From vessel to final disposal: 1,511 tonnes of attic oil managed

View case study
  • Decomissioning
Picture1

Waste management, radiation protection and lifting support for recovery of North Sea’s Largest Subsea Isolation Valve

View case study

Unlock greater operational control.

Strengthen your operation with the expertise and processes that move complex assets with greater speed, safety, and discipline.