Tananger supply base

Industries menu image

NORM CC

7 July 2026

Contaminated materials safely managed during gas infrastructure decommissioning

Truck offload

29 June 2026

98% recycling rate achieved in complex decommissioning project

Client item offloaded

29 June 2026

98.87% recycled, 0% NORM: Flexible waste management for 18 multi-field wellheads

NORM contaminated coil tubing

29 June 2026

Dry ice blasting for NORM-contaminated coil tubing reel reduces time and waste

NORM2

17 November 2025

Safely retiring offshore assets for Chevron’s Thevenard Island project.

Unlock greater operational control.

Strengthen your operation with the expertise and processes that move complex assets with greater speed, safety, and discipline.