Tananger supply base

Industries menu image

Safely retiring offshore assets for Chevron’s Thevenard Island project.

Chevron Australia required a full decommissioning and remediation of ageing offshore infrastructure at Thevenard Island (TVI). The project involved safe retirement of platforms, environmental restoration, and management of hazardous and Naturally Occurring Radioactive Material (NORM) under strict regulatory standards.

NORM2

Client

Chevron Australia

Type

Decommissioning, NORM

Location

Onslow Marine Support Base, Western Australia

Dampier hero NORM Decom

At a glance

Approach

  • Deploying Radiation Safety Officers and establishing supervised processing areas
  • Optimising site layouts and embedded radiation monitoring protocols
  • Controlled offloading, size reduction, and storage of NORM-contaminated materials
  • On-site NORM awareness training, continuous risk assessments, and advanced monitoring/reporting systems for transparency and traceability

Impact

  • Zero incidents during NORM handling and processing
  • 100% regulatory compliance in radiation safety and hazardous material management
  • Enhanced workforce capability through training and knowledge sharing
  • Environmental stewardship achieved through proper remediation and waste management

Unlock greater operational control.

Strengthen your operation with the expertise and processes that move complex assets with greater speed, safety, and discipline.