Tananger supply base

Industries menu image

Back to case studies

Environmental

NORM CC

7 July 2026

Contaminated materials safely managed during gas infrastructure decommissioning

Methanol Case Study

30 June 2026

14,000 tonnes of methanol regenerated through managed off-site processing

Truck offload

29 June 2026

98% recycling rate achieved in complex decommissioning project

Client item offloaded

29 June 2026

98.87% recycled, 0% NORM: Flexible waste management for 18 multi-field wellheads

NORM contaminated coil tubing

29 June 2026

Dry ice blasting for NORM-contaminated coil tubing reel reduces time and waste

Aberdeen south harbour ship

29 June 2026

From vessel to final disposal: 1,511 tonnes of attic oil managed

Unlock greater operational control.

Strengthen your operation with the expertise and processes that move complex assets with greater speed, safety, and discipline.